The School for Champions is an educational website that shows you how to achieve your dreams.



TQM topics

Basic principles

Basic Principles of Total Quality Management

Everyone is Not a Customer in TQM

Techniques to get good work and supplies

Getting Quality Goods From Your Suppliers

Case Study of Empowering Civil Servant Secretaries

Tools to reduce waste and failures

Inspection Methods to Fulfill Quality Requirements

Prevent Mistakes with Poka-Yoke

Variability Reduction in Manufacturing

Techniques to get more business

Satisfy Your Customers to Increase Business and Reduce Losses

Dealing with Customer Complaints

Applications

Quality in the Restaurant Business

Applying TQM in a Church

Using TQM for Competitive Advantage in Business - Competition section

Presentations and reports

TQM Plan for Martin Marietta Electronics and Missile Group

GE Astro Space Engineering Process Improvement

Quality Improvement Report for the State of Wisconsin

TQM in U.S. Air Force Systems Command

Air Force Weapons Lab TQM Continuous Improvement Plan

TQM in the Strategic Defense Initiative Organization (SDIO)

U.S. Air Force Space Systems Division Total Quality Booklet

Three Phase Approach to TQM in the Air Force's SDI Programs

Strategic Defense Initiative TQM Newsletters

Also see

Weekly Feedback Blog

TQM Survey Results

Succeed with ISO 9000

Succeed in Business

Advance in Your Career


SfC Home > Business > ISO 9000 > TQM >

Explanation of Inspection Methods to Fulfill Quality Requirements - Improve Your Business with Total Quality Management (TQM). Also refer to defects, failures, production line, rejection rate, requirements, specifications, waste, managers, workers, engineers, quality control, Ron Kurtus, School for Champions. Copyright © Restrictions

Inspection Methods to Fulfill Quality Requirements

by Ron Kurtus (revised 27 May 2008)

Whenever work is done or a product or part is made—whether it is a piece of hardware manufactured on the assembly line, a memo typed by a secretary, or code developed by software programmers—it should be inspected to see that it fulfills the requirements and specifications. This is certainly a wise business practice. Some companies accept a certain failure rate, while others try to correct the problems they see from their inspection. Inspecting and then correcting will save a company money.

Questions you may have include:

This lesson will answer those questions. There is a mini-quiz near the end of the lesson.

Sorting out failures

The most common type of inspection that has been done for years on the assembly lines involves sorting the defective items from the acceptable product. This method is sometimes referred to as "creating quality by inspection" and is not considered an effective quality management approach.

Production line inspection

For example, at the end of a production line the inspector gives final approval whether or not parts are good. The rejects are put into scrap or are re-worked. This assures only quality material reaches the next stage, but it does not address the cause of the failed parts nor does it correct that problem.

Office work inspection

In another situation, office workers may complete reports only to have their manager reject many of them as unacceptable. Those reports must be re-done until acceptable. Again, the reason for the failures is not addressed, and the rejection rate remains constant.

Not a good approach

In both cases, sorting out failures can be a wasteful and expensive method to get quality goods.

Another thing it does is to accept a certain level of failure. That acceptance subtly creates an atmosphere of accepting failure in all work that is done by the company.

Gathering failure information

A more effective method to inspect consists of gathering information and using data gained from inspection to control the process and prevent future defects. Statistical Process Control (SPC) is a type of this type of  inspection.

Inspections at intermediate stages

Since work-in-process undergoes many operating steps as it is moved through a manufacturing facility, inspections are often conducted at intermediate stages in the process. The inspections give statistical information necessary to determine the cause of the quality problem, so that it can be prevented in the future. SPC does not aggressively seek to eliminate defects and in some cases changes may be implemented too slowly to be fully effective.

White collar examples

One example in the office is that the boss may inspect a report at various stages, making corrections. He may then see that perhaps there was a communication problem in stating the requirements that may be rectified.

In the office, the engineering manager may monitor the designs of his engineers, making corrections along the way. The engineers learn from his changes and the final design is relatively free of errors.

This method of making inspections at intermediate stages is certainly better than waiting until the product in completed to inspect for acceptance or rejection.

Inspection by workers

One other inspection method is to have workers inspect the item from the prior operation before proceeding. In this way quality feedback can be given on a much timelier basis. Each operation performs both production and quality inspection.

By monitoring where most problems occur in a production line, a quality manager can pinpoint causes—whether it is a drunk worker or a defective piece of equipment.

In an office environment, there is no individual monitoring the quality of the work, as there often is in a factory. Perhaps there should be. Typically, when a piece of work gets passed from one person to another, informal corrections are told to the pervious worker.

Summary

Sorting out failures is a common form of inspection, but it does not address the problems. Statistical measurements of where failures occur is a way to find out causes. Workers can inspect parts before starting and notify previous persons in the process of problems in quality. Inspection and correcting reasons for failure is important in reducing wasteful expenses in a company.

Answers to Readers' Questions


Set a tone for quality in your organization


Resources

The following are some resources on this topic.

Web sites

TQM Resources

Books

Top-rated books on Total Quality

Top-rated books on Business Quality

Top-rated books on Six Sigma

Top-rated books on ISO 9000


Mini-quiz to check your understanding

1. Is giving a student a failing grade on a test an effective way to improve quality?

Yes, it let's him know he is dumb and should do better

No, it is sorting out failures and not addressing the problem

It depends on the age of the student

2. What is an important aspect of SPC?

It is seeking to improve the process and not the worker

It gives statisticians job security

It weeds out failures before products are delivered

3. Where is inspection by the next worker most effective?

In an office where people like to criticize others

In companies that don't want to hire QA people

In an assembly-line environment

If you got all three correct, you are on your way to becoming a Champion in Total Quality. If you had problems, you had better look over the material again.


What do you think?

Do you have any questions, comments, or opinions on this subject? If so, send an email with your feedback. We will try to get back to you as soon as possible.


Share link

Feel free to establish a link from your website to pages in this site.

Or use our form to send this link to yourself or a friend.


Students and researchers

The Web address of this page is:
www.school-for-champions.com/tqm/inspection.htm.

Please include it as a reference in your report, document, or thesis.


Where are you now?

School for Champions

Total Quality Management (TQM) topics

Inspection Methods to Fulfill Quality Requirements


The School for Champions helps you become the type of person who can be called a Champion.